OVERALL POWER SUPPLY POSITION IN THE STATE OF HARYANA

The total installed generation capacity available with the State of Haryana is 4068.01 MW. Out of this 1587.4 MW is located within the State at the Thermal Power Stations in Panipat, Faridabad and Hydro-electric Station at Yamuna Nagar.

The available capacity varies between 2500 to 3300 MW during different seasons depending upon inflows at Hydro Stations/planned/forced outages of the generators. The demand varies between 2800 to 5000 MW in various seasons and during off peak & peak hrs.

The demand of Haryana is increasing exponentially @ more than 14 % per year on account of industrialization and more consumption on agriculture sector and also because of being part of National Capital Region. The power availability from above mentioned projects is not sufficient to meet the demand of the State particularly during peak Paddy and Rabi crop season. As such HPGCL has to resort to short term power purchase and planning of long term power arrangements. The project wise details are as under:-

Project

Capacity (MW)

Haryana’s Share(MW)

BBMB

2876.00

875.00

NHPC

2972.20

329.90

NTPC

6542.27

472.10

NPC

880.00

76.10

I.P.

187.50

62.50

FGPP

432.00

432.00

MAGNUM

25.00

25.00

NJPC

1500.00

65.00

HPGCL

1587.40

1587.40

Tehri Hydro

1000.00

43.00

Farakka

1600.00

33.44

Kahalgoan

840.00

51.58

Tala Hydro (ER)

1020.00

14.99

TOTAL

4068.01

The available capacity varies between 2500 to 3300 MW during different seasons depending upon inflows at Hydro Stations/planned/forced outages of the generators. The demand varies between 2800 to 5000 MW in various seasons and during off peak & peak hrs.

1.      The position of power supplied to the state and agriculture sector during last3 years is as follows:-

Average Lacs units per day

Month

State as whole

Agriculture sector

 

2005-06

2006-07

% increase over

2005-06

2007-08

% increase over

2006-07

2005-06

2006-07

% increase over

2005-06

2007-08

% increase over

2006-07

April

547

564

3%

608

7.8

235.68

239.24

2%

240

-

May

645

692

8%

733

5.92

306.15

307.42

1%

317

5.31

June

695

772

11%

847

9.7

358.24

393.53

10%

420

6.8

July

700

780

12%

924

18.5

364.80

408.09

12%

481

18.7

Aug

755

769

2%

911.65

18.5

424.98

434.32

3%

486

11.9

Sept

642

753

18%

813

7.96

331.02

386.00

18%

391

1.3

Oct.

644

672

5%

686

2.10

323.49

346.00

7%

348

0.5

Nov.

569

597

5%

628

5.20

276.46

279.00

1%

304

8.96

Dec.

547

611

12%

623

2.0

285.53

300.00

5%

299

0.0

Jan.

592

615

4%

   

301.32

313.00

4%

   

Feb.

584

571

-3%*

   

295.74

257.00

-14%*

   

March

536

573

7%

   

247.91

243

-2%*

   

Consumption is less due to wide spread rains in the State.

2.  Rain fall data during last 3 years:-

(Fig. In mms)

Month

Normal

2004

2005

2006

2007

Actual

Actual

Actual

Actual

January

22.4

35.5

18.4

2.8

0.3

February

17.5

2.8

38.0

0.3

83.8

March

14.7

0

38.4

40

51.1

April

7.3

12.4

3.7

0.9

0.7

May

14.7

43.7

8.5

30.1

7.7

June

48.0

72

59.3

48

78.2

July

185.0

25.6

217.3

152.8

63.6

August

184.7

276.7

64.5

43.5

77.5

September

95.3

28.5

169.9

51.5

44.0

October

17.0

57.7

0

3.3

0.80

November

5.0

0

0.7

0.6

0.00

December

7.7

0.3

0.0

2.0

1.20

3.      The availability of the power from long term source to the state during April to Dec. 07 was as under:-

Average Lacs units per day

Source

April

May

June

July

Aug

Sept.

Oct.**

Nov.**

Dec. **

NTPC

119.49

127.07

130.97

118.21

118.99

130.48

128.08

120.03

127.59

NHPC

65.86

65.03

69.06

71.27

68.07

47.9

23.98

16.52

12.52

NPC

2.73

4.58

10.08

9.94

10.00

7.28

7.6

9.17

6.82

FGPS [Gas]

47.76

72.11

79.80

75.37

83.32

47.85

61.17

63.96

63.32

BBMB

80.01

93.82

105.28

116.70

117.03

111.06

72.36

62.44

61.94

HPGC

243.53

240.20

267.70

298.90

310.74

262.04

259.2

279.26

273.07

IP Share

6.37

7.88

7.98

7.11

7.84

7.56

6.9

7.88

7.34

Malana

7.42

7.86

12.86

0

0

0

0

0

0

NJPC

9.26

15.70

20.24

21.82

15.06

17.02

7.67

5.16

4.03

Tehri

1.78

2.10

4.34

7.21

7.93

4.88

3.60

3.03

3.74

Tala, Farakka & Kehlgaon

6.81

7.19

9.30

10.76

15.15

14.97

15.07

16.05

17.31

Unallocated CSGS

*

*

*

*

*

*

*

*

*

Total Availability

591.02

643.54

717.61

737.29

754.13

651.04

585.63

583.50

577.68

*     Un allocated share is included in NTPC & NHPC total availability.

**   Operational Data.

4.           In order to bridge the gap between demand and supply during April to Dec. 07, the power availability through short term power arrangements was as under:-

 

Figures in Lacs unit/day

Short term arrangements

April

May

June

July

Aug

Sept.

Oct.*

Nov.*

Dec. *

Short term power purchase

0.00

28.40

41.70

31.60

22.60

17.39

7.22

-

3.55

Banking arrangements

1.80

3.15

14.80

30.00

66.00

26.71

4.6

14.48

-4.18

Over drawl from GRID

68.10

102.00

83.60

144.30

103.90

130.53

102.45

40.58

54.72

Total

69.90

133.55

140.10

205.90

192.50

174.63

114.27

55.06

54.09

* Operational Data.

5.            The anticipated availability of the power from long term sources, demand projection and corresponding short falls during Jan 08 to March 08 are as under:-

Average Lacs units per day

Source

Jan.

Feb.

March

1-15

16-31

NTPC

93.5

93.5

93.5

93.5

NHPC

18.5

18.5

23.2

32

NPC

14.3

14.3

14.3

14.3

FGPS [Gas]

75

75

75

75

BBMB

50

50

50

70

HPGC*

255

290

345

281

IP Share

4.8

4.8

4.8

4.8

IPPs Magnum

0

0

0

0

NJPC

4

4

6

8

Tehri

1.5

1.5

1.5

2

Tala, Farakka & Kehlgaon

12

12

12

12

Unallocated CSGS

30

30

30

30

Total Availability

558.6

594

655

623

Demand during 2007 - 08  with 8% growth over actual supplied 2006-07

664

664

616

619

Demand during 2007-08 with 8% growth over unrestricted 2006-07

746

746

659

651

Anticipated short fall / surplus with 8% growth over unrestricted demand during 2006-07

-187

-152

-14

-28

Anticipated short fall / surplus with 8% growth over actual supplied during 2006-07

-105

-70

29

4

* Generation from unit#1 of YTPP has been taken from 16th Jan. 08 to 31st Jan. 08. as 35 LUs/day whereas from 1st Feb. 08 it has been considered as 55 LUs/day. Generation from unit #2 of YTPP which is scheduled for synchronization on 1st Feb. 08 has not been considered as it will take time for stabilization.

There may be additional availability by 30 LUs per day from over drawl from Grid and 25 LUs per day from liquid scheduling.

TOP
top


 

Copyright © 2004-2007 HPGCL ® All rights reserved. Site Maintained & Developed by Hartron