OVERALL POWER SUPPLY POSITION IN THE STATE OF HARYANA
The total installed
generation capacity available with the State of Haryana
is 4068.01 MW. Out of this 1587.4 MW is located within the State
at the Thermal Power Stations in Panipat, Faridabad
and Hydro-electric Station at Yamuna Nagar. The
available capacity varies between 2500 to 3300 MW during different seasons depending
upon inflows at Hydro Stations/planned/forced outages of the generators. The demand
varies between 2800 to 5000 MW in various seasons and during off peak & peak
hrs. The
demand of Haryana is increasing exponentially @ more than 14 % per year on account
of industrialization and more consumption on agriculture sector and also because
of being part of National Capital Region. The power availability from above mentioned
projects is not sufficient to meet the demand of the State particularly during
peak Paddy and Rabi crop season. As such HPGCL has to resort to short term power
purchase and planning of long term power arrangements. The project wise details
are as under:- The
available capacity varies between 2500 to 3300 MW during different seasons depending
upon inflows at Hydro Stations/planned/forced outages of the generators. The demand
varies between 2800 to 5000 MW in various seasons and during off peak & peak
hrs.
| Average
Lacs units per day | |
|
| | |
| |
|
|
|
|
|
|
|
|
|
| | |
|
|
|
|
|
|
2% |
240 |
- |
| | |
|
|
|
|
|
|
1% |
317 |
5.31 |
| | |
|
|
|
|
|
|
10% |
420 |
6.8 |
| |
|
|
|
|
|
|
|
12% |
481 |
18.7 |
| | |
|
|
|
|
|
|
3% |
486 |
11.9 |
| | |
|
|
|
|
|
|
18% |
391 |
1.3 |
| | |
|
|
|
|
|
|
7% |
348 |
0.5 |
| | |
|
|
|
|
|
|
1% |
304 |
8.96 |
| | |
|
|
|
|
|
|
5% |
299 |
0.0 |
| | |
|
|
|
| |
|
4% |
|
| | | |
|
|
|
| |
|
-14%* |
|
| | |
|
|
|
|
| |
|
-2%* |
|
| 2.
Rain fall data during last 3 years:-
Average
Lacs units per day | |
Source |
April |
May |
June |
July |
Aug |
Sept. |
Oct.** |
Nov.** |
Dec.
** | |
NTPC
| 119.49 |
127.07 |
130.97 |
118.21 |
118.99 |
130.48 |
128.08 |
120.03 |
127.59 |
| NHPC |
65.86 |
65.03 |
69.06 |
71.27 |
68.07 |
47.9 |
23.98 |
16.52 |
12.52 |
| NPC |
2.73 |
4.58 |
10.08 |
9.94 |
10.00 |
7.28 |
7.6 |
9.17 |
6.82 |
| FGPS
[Gas] | 47.76 |
72.11 |
79.80 |
75.37 |
83.32 |
47.85 |
61.17 |
63.96 |
63.32 |
| BBMB |
80.01 |
93.82 |
105.28 |
116.70 |
117.03 |
111.06 |
72.36 |
62.44 |
61.94 |
| HPGC |
243.53 |
240.20 |
267.70 |
298.90 |
310.74 |
262.04 |
259.2 |
279.26 |
273.07 |
| IP
Share | 6.37 |
7.88 |
7.98 |
7.11 |
7.84 |
7.56 |
6.9 |
7.88 |
7.34 |
| Malana |
7.42 |
7.86 |
12.86 |
0 |
0 |
0 |
0 |
0 |
0 |
| NJPC |
9.26 |
15.70 |
20.24 |
21.82 |
15.06 |
17.02 |
7.67 |
5.16 |
4.03 |
| Tehri |
1.78 |
2.10 |
4.34 |
7.21 |
7.93 |
4.88 |
3.60 |
3.03 |
3.74 |
| Tala,
Farakka & Kehlgaon |
6.81 |
7.19 |
9.30 |
10.76 |
15.15 |
14.97 |
15.07 |
16.05 |
17.31 |
| Unallocated
CSGS | * |
* |
* |
* |
* |
* |
* |
* |
* |
| Total
Availability |
591.02 |
643.54 |
717.61 |
737.29 |
754.13 |
651.04 |
585.63 |
583.50 |
577.68 |
5.
The anticipated availability of the power from long term sources, demand projection
and corresponding short falls during Jan 08 to March 08 are as under:-
| Source |
Jan. |
Feb. |
March |
| 1-15 |
16-31 |
| NTPC
| 93.5 |
93.5 |
93.5 |
93.5 |
| NHPC |
18.5 |
18.5 |
23.2 |
32 |
| NPC |
14.3 |
14.3 |
14.3 |
14.3 |
| FGPS
[Gas] | 75 |
75 |
75 |
75 |
| BBMB |
50 |
50 |
50 |
70 |
| HPGC* |
255 |
290 |
345 |
281 |
| IP
Share | 4.8 |
4.8 |
4.8 |
4.8 |
| IPPs
Magnum | 0 |
0 |
0 |
0 |
| NJPC |
4 |
4 |
6 |
8 |
| Tehri |
1.5 |
1.5 |
1.5 |
2 |
| Tala,
Farakka & Kehlgaon | 12 |
12 |
12 |
12 |
| Unallocated
CSGS | 30 |
30 |
30 |
30 |
| Total
Availability | 558.6 |
594 |
655 |
623 |
| Demand
during 2007 - 08 with 8% growth over actual supplied 2006-07 |
664 |
664 |
616 |
619 |
| Demand
during 2007-08 with 8% growth over unrestricted 2006-07 |
746 |
746 |
659 |
651 |
| Anticipated
short fall / surplus with 8% growth over unrestricted demand during 2006-07 |
-187 |
-152 |
-14 |
-28 |
| Anticipated
short fall / surplus with 8% growth over actual supplied during 2006-07 |
-105 |
-70 |
29 |
4 |
*
Generation from unit#1 of YTPP has been taken from 16th Jan. 08 to
31st Jan. 08. as 35 LUs/day whereas from 1st Feb. 08 it
has been considered as 55 LUs/day. Generation from unit #2 of YTPP which is scheduled
for synchronization on 1st Feb. 08 has not been considered as it will
take time for stabilization. There may be additional availability by
30 LUs per day from over drawl from Grid and 25 LUs per day from liquid scheduling. |